On 22 March 2012, the Board voted to accept the proposal by Ronald G. Carlson Inc. for the work to control the growing erosion gully which has been threatening the sanctuary foundation.
The successful bid is a proposal for a collection box to be located where the collapsed sidewalk segment was, which will then feed water into an open topped concrete flume (basically, a shallow, open topped concrete lined trough) that will run down the slope to an outflow near the bayou.
Additionally, a concrete curb will be cast in place on the lawn side of the sidewalk along the northwest side of the sanctuary to contain and control the run-off of water from the roof downspouts. Due to the soil character and steepness of the slope the work will be almost entirely hand labor.
Mr. Carlson has agreed to come and discuss the project in detail with board members and all interested parties on Saturday, 7 April 2012, at 12:00 PM.
The capital fund drive concludes Sunday, 8 April 2012. We have received enough funds to complete the above construction, but still need additional funds for the topographic and erosion reports.
Thank you to all who have so generously contributed to this effort and for your prompt generosity! If you have not done so, please submit your payment to the church no later than 8 April 2012.