Our monthly building and grounds work day is happening on Saturday (13 April 2024) from 10:00 AM to 2:00 PM. This monthly work day usually happens on the second Saturday of each month with the occasional rare exception.
With the exception of some basic cleaning and yard work, all the work of maintaining our physical home is done by us — the members and friends of All Souls.
The sanctuary still needs some shop-vac attention after the heavy rains this past week (although it’s not as squishy as it was two days ago).
There are tasks indoors and out for all ages and abilities — this can be a great way to better know your All Souls friends as you join in a common task.